Client: Foskor
Location: Richards Bay Foskor Plant
Scope of works: Installation of subsoil drainage in the Plant area
Completion date: 29/06/2013
Capital cost: R24 761 969.93

BACKGROUND

Ukhasi Construction was appointed by Foskor for the Installation of Subsoil Drainage in the Plant Area.

DESCRIPTION

The works consisted of the following activities

  • Drainage is the removal of excessive water from the soil profile.
  • Pipe subsoil drains is constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown on drawings provided by the client.
  • The work shall include: the construction of trenches, the supplying and laying of perforated pipes of the specified type and size; the jointing of the pipes; the supplying and compacting of approved backfilling materials; the construction of connecting and outlet drains; the supply of all materials; labour, plant, tools and transport required for the proper completion of the contract.